New 787 Dreamliner report doesn't suggest a quick fix

Written By Unknown on Monday, 21 January 2013 | 07:16

(CNN) — As a poser deepened surrounding a new 787 Dreamliner battery system, U.S. sovereign investigators were set to control some-more tests directed during eventually returning Boeing’s grounded aircraft to a sky.

Tuesday’s NTSB tests will be conducted during a special trickery Arizona.

Tests conducted in Washington uncover that a lithium-ion battery that held glow aboard an dull JAL Boeing 787 Dreamliner in Boston this month was not overcharged, a National Transportation Safety Board pronounced Sunday.

Suspicions about a batteries and a probable glow risk stirred a U.S. Federal Aviation Administration and other nations to belligerent all 50 Dreamliners worldwide final week, tentative an review of a Boston glow and other reports of automatic problems.

The aircraft, that costs about $200 million and debuted

Read full article: http://www.thesun.co.uk/sol/homepage/showbiz/4648481/kristen-stewart-breaking-dawn-part-2-madrid.html


Source:
http://www.news.ezonearticle.com/2013/01/21/new-787-dreamliner-report-doesnt-suggest-a-quick-fix/

0 comments:

Post a Comment